Skip to content
Skip to the tool
  1. 1Stage 1
  2. 2Stage 2
  3. 3Stage 3
← All tools

Use Case Prioritisation Matrix

Business analysisDigital and data

Reference model

Use Case Prioritisation MatrixA two-by-two grid. The horizontal axis is Feasibility, from Low to High. The vertical axis is Value, from Low to High. The four quadrants are top left: Quick Wins; top right: Major Projects; bottom left: Fill-ins; bottom right: Time Sinks.Quick WinsHigh value, low effort. Prioritizethese.Do firstMajor ProjectsHigh value, high effort. Plancarefully.PlanFill-insLow value, low effort. Only if timeallows.If spare timeTime SinksLow value, high effort. Avoid these.AvoidLowHighFEASIBILITYLowHighVALUE

High value and low effort use cases should be prioritized.

About this model

A matrix that evaluates use cases based on their potential value and the effort required to implement them.

Originator not stated.

How to read it

  • Focus on the top-left quadrant: high value, low effort.
  • Be cautious of the bottom-right quadrant: low value, high effort.

What this does

Helps teams prioritize use cases based on their value and feasibility, ensuring that the most impactful cases are addressed first.

When to use it

Use it when there are multiple use cases to consider and limited resources to implement them.

Not when: Do not use it when all use cases are equally important or when there is no clear way to measure value and feasibility.

What happens next

Develop detailed action plans for the top prioritized use cases.

Golden thread

Builds on ←

  • Project goals
  • Use case list

Feeds into →

  • Implementation plan

Use this tool, free

Sign in to open the worksheet. Your work saves as you type, the AI can draft the parts you have not filled in, and you finish with an analysis and a 30/60/90-day action plan.

Drafted with AI and reviewed by Eccellere on 04/11/2026. Guidance, not advice: apply your own judgement.